Detailed CLLARE lunar landing flight plan

From CSTART Wiki

Jump to: navigation, search
Time Event
LEO Insertion
00:00:00 Launch vehicle lift off
00:00:?? First stage separation
00:00:?? Second stage separation
Parking orbit
00:??:?? Complete systems check.
Check of all communications channels, etc. Decision is made on the basis of this check whether to continue with flight or to abort (initiate reentry using PM and then separate CM from rest of stack).
00:??:?? Orbit determination
Estimate as accurately as possible the parameters of the orbit that the spacecraft has been inserted into. This could in principle be done entirely from onboard the spacecraft (using GPS, IMU, horizon sensors, etc.), but ground based observations will improve accuracy and should be used too.
00:??:?? Trajectory planning
Based on determined orbit, compute the best possible time, attitude and burn duration for TLI.
00:??:?? pre-TLI Attitude adjustment
Use of RCS to ensure spacecraft has correct attitude for TLI.
00:??:?? Trans Lunar Injection
Burn PM engines for calculated time.
Lunar Transfer
00:??:?? First PM engine test burn
Burn PM engines posigrade for brief time.
00:??:?? Second PM engine test burn
Burn PM engines retrograde for brief time.
00:??:?? Third PM engine test burn
Burn PM engines retrograde for brief time.
00:??:?? pre-LOI Attitude adjustment
Use of RCS to ensure spacecraft has correct attitude for LOI.
00:??:?? Lunar Orbit Insertion
Burn PM engines for calculated time.
Lunar Orbit
00:??:?? Orbit determination
Estimate as accurately as possible the parameters of the lunar orbit that the spacecraft has been inserted into. This will be more difficult than the initial Earth orbit determination: no GPS, and probably no useful ground measurements. Horizon sensors may still work. IMU based estimates, radar/laser altimeters and visual observation will probably be key.
00:??:?? Extravehicular transfer to LL
00:??:?? Separation of LL from CM
00:??:?? Descent Orbit Insertion
Burn LL engine for calculated time.
Lunar Descent
00:??:?? Touchdown
Lunar EVA
00:??:?? Flag planting
Plant Blue Marble flag.
00:??:?? Return to LL
Lunar Ascent
Lunar Orbit
00:??:?? Extravehicular transfer to CM
00:??:?? CM repressurization.
00:??:?? LL orbit lowering.
The LL must be remotely controlled from the CM such that it moves a safe distance away from the CM and then performs a short orbit-lowering burn so that it is out of the way for TEI.
00:??:?? pre-TEI Attitude adjustment
Use of RCS to ensure spacecraft has correct attitude for TEI.
00:??:?? Trans Earth Injection
Burn PM engines for calculated time.
Earth Transfer
Reentry
00:??:?? CM separation