CLLARE Design Task Tree
From CSTART Wiki
(Redirected from CLLARE Design Tasks)
This page is part of an implementation of the CSTART Engineering Process. Anyone can edit it, but it should only be modified in accordance with the procedures and guidelines of the Process. Please check before editing if you are in doubt.
Contents |
[edit] Mission Planning Workgroup
- Launch vehicle selection
- Launch site selection
- Landing site selection
- Lunar EVA activity
[edit] Spacecraft Engineering Workgroup
- Command Module design
- Structure
- Power subsystem
- Thermal Protection System
- Recovery system
- Orbital Support Module design
- Structure
- Shape
- Materials
- Connection to CM
- Consumables subsystem
- Tank material
- Retrorocket mount
- Structure
- Propulsion Module design
- Pressurant tank design
- Tank shape
- Tank wall material
- Propellant tank design
- Tank shape
- Tank wall material
- Pressurant tank design
- Lunar Lander design
- CM-LL docking mechanism
[edit] Propulsion Workgroup
- CM RCS design
- CM Retrorocket system
- Engine type
- Propellant choice
- OSM RCS design
- LL RCS design
- Common Engine design
[edit] Life Support Workgroup
- CM Environmental Control System design
- Atmosphere choice
- CO2 scrubbing system
- Oxygen injection system
- Atmosphere temperature system
- Odor control system
- Humidity control system
- Waste Management System design
- Liquid waste management
- Solid waste management
- Diet planning
- Suit design
[edit] Navigation and Guidance Workgroup
- Flight planning
- Lunar transfer plan
- Lunar Lander Descent plan
- Lunar Lander Ascent plan
- Earth atmospheric reentry plan
- CM Navigation system design
- GPS subsystem
- Inertial navigation subsystem
- Radio navigation subsystem
- Stellar navigation subsystem
- Filtering algorithm
- CM Guidance system design
- LL Navigation system design
- LL Guidance system design
[edit] Computer Systems Workgroup
- Motherboard/CPU selection
- Radiation shielding
- Reliable Data Storage System design
- Operating system choice
- Onboard software programming language choice
[edit] Communications Workgroup
- CM-Earth communication system
- Antenna design
- Frequency selection
- Modulation scheme selection
- Multiplexing technology selection
- Telemetry system
- Telemetry packet format
- Telecommand system
- Authentication
- Telecommand command list
- Telecommand packet format
- CM-LL communication system
[edit] Operational
- Legal
- Launch license/permit requirements
- Safety
