Today, I got a parcel from Sanjoy Som, at One Flag in Space, containing a printed copy of the CLLARE Project Overview document which he hand-annotated with a lot of helpful comments and suggestions.
I don't have access to a scanner at the moment, and have quite a busy schedule for today, so for now I'm just going to transcribe the broad level comments he left on the front page. I will try to publish more detailed comments soon:
Interesting concept!
- Have there been trade studies to justify particular design choices? (e.g. power)
- Is OTRAG booster part of CLLARE?
- Astronaut positioning in LL & CM is cause for concern.
- Lack of solar panels is intruiging
- Would increase value if there was a cargo only option
- delta v very minimalistic. There are plane changes to deal with which will add to the delta v budget
- Love the "open-air" LL
- At this stage of the document you could combine most of chapter 2 w/ chapter 4
- A ummary project overview could go as section 1.5
- Collaboration w/ openluna in EVA suit obvious.
- Power budget needs expansion
- Needs a section for GNC & thermal
- I would not stray from spherical tanks –> adds redundancy & safety
For the most part Sanjoy's comments seem fairly positive, which is great. He does draw attention to some issues that we certainly need to consider.
Again, I will expand on the above in future.